Step By Step

 
  1. First you survey property for existing underground obstacles, such as water, gas, electrical or sprinkler systems.

  2. Then you dig an entry access point.

  3. After that dig an exit access point

  4.    Fuse new pipe together for the length of the pull and attach bullet cutting head.

  5. String pull line through existing old pipe.

  6. Attach pull line to new pipe and bullet burster.

  7.  Setup hydraulic pulling mechanism at the exist side of job

  8. Start pulling new pipe through old pipe. Burtsting the old pipe as it is being pulled along.

  9. Once complete, cut off bursting head and attach pipes to the house on one end and the exit point on the other end. Installing all necessary cleanouts.

  10. Fill in entry and exit access points and compact.

 

The job is now complete, with very little destruction to landscaping and minimal downtime of your plumbing system. All necessary permits are obtained and all city and county inspections are done to insure proper installation.